1.) Public
Hearing – Five Year Capital Program 2011-2015 (Review & Discussion).
Chairman
Paulus opened the Public Hearing relative to the Proposed Five
Year Capital Program. The Township Manager opened the discussions
by advising the Board that in reviewing the introduction to
the proposed Capital Program, they should note that the major
appropriations occur in the programs titled Municipal Building
and Future Road Construction Projects.
At this point
in the meeting, Councilwoman Hayden questioned the status of
the Chestnut Grove Towne Garden Development Sewer Line Replacement
Project. The Township Manager noted that the Township has applied
through Lehigh County for a CDBG Grant for said project. It
appears that revenues will be available in the year 2011 for
the work. The Township has completed the appropriate application
and is hopeful that funding will be available. The Township
Manager noted that the sewer line replacement work would be
accomplished in the year 2011 and the following year repaving
of the roadways would occur.
With respect
to the program titled Sinkholes/Miscellaneous Storm Water Projects,
the Township Manager advised the Board that this program shows
an appropriation of $25,000 each year for the duration of the
five year period. The Township Manager noted that the monies
in Escrow for this program are in excess of $314,000 and it
was the feeling of the Township Manager and the Board that
the monies in Escrow plus the appropriation were sufficient
at this time.
With respect
to the program titled Traffic Congestion Improvements, the
Township Manager noted that this program relates majorly to
the Race Street/Willowbrook Rd. Signal Light Project. Currently,
there is only $32,000 in Escrow, but the road work for the
project has been funded through the Capital Program for Future
Road Construction Projects. The Township Manager noted that
she is showing a $25,000 appropriation across the Board for
the duration of the five year period. A discussion ensued with
respect to the lengthy project for the Race St./Willowbrook
Rd. Signal Light and the excessive cost of three quarters of
a million dollars for the project, the majority of the cost
being the direct result of Penn DOT’s requirements. Councilman
Atkinson indicated that he felt that correspondence should
be sent to both the State Senator and State Representative
outlining the details of the lengthy process the Township was
subjected to in this instance and the Township’s displeasure
over the Penn DOT requirements and the excessive cost.
With respect
to the program titled Future Road Construction Projects, the
Township Manager noted that revenue showing in escrow of $1.2
million dollars will be somewhat depleted as a result of costs
incurred for the Race St./Willowbrook Rd. Project which currently
are unpaid although some payments have been issued to the contractor,
as well as the 2010 Road Program. The Township Manager noted
that she is showing an appropriation of $200,000 a year across
the Board during the five year duration of the program. The
Board found this program acceptable.
With respect
to the program titled Catastrophe Fund, the Township Manager
noted that in reviewing the program, the Board will note that
she is showing a transfer out of the Catastrophe Fund Program
to the Municipal Building Construction Project in the amount
of $150,000 leaving a balance in Catastrophe Fund of $147,000.
The Township Manager advised that she felt that the monies
in Escrow are sufficient and that the excess revenues could
be transferred to the Township’s largest project; namely,
the Municipal Building Construction. The Board agreed with
that scenario.
With respect
to the program titled Canal Project, a discussion ensued regarding
the issue of restoring water to the Canal. Councilman Atkinson
indicated his dissatisfaction that the Army Corps of Engineers
has refused to cooperate and has indicated that they consider
the area wetlands. Councilman Atkinson felt that the Township
should look for support at the state and or federal level to
get the Army Corps of Engineers to cooperate. Councilman Atkinson
also commented on the Catasauqua Lake Project indicating that
on the east side there is a large area which is very shallow
and flat and questioned whether or not that area is going to
be restored. The Township Manager advised she would look into
that matter. With respect to the appropriations in the program,
the Township Manger noted that this program shows a $25,000
per year appropriation across the Board. Council found the
proposed program acceptable.
With respect
to the program titled Pump Station Upgrades and Sewer Line
Upgrades, the Township Manager advised this program shows a
$350,000 appropriation in the year 2011 and a $150,000 appropriation
for the years 2012 through 2015. It was noted that the appropriation
in the year 2011 is set at the $350,000 figure to accommodate
the proposed sewer line replacement work in the Chestnut Grove
Towne Garden Development should funding under the CDBG Grant
not be available. With respect to this program, the Board found
it acceptable as presented.
With respect
to the program titled Allentown Water System Improvements,
the Township Manager advised that the program shows a $250,000
appropriation in the year 2011 and a $100,000 appropriation
across the Board for the years 2012 through 2015. There was
a discussion with respect to this program and the fact that
the Township has historically set aside revenues for future
maintenance. The Board found the program acceptable.
With respect
to the program for the Municipal Building Construction, the
Township Manager advised that the program currently shows an
$875,000 appropriation in the year 2011, a portion of which
represents the transfer in of $150,000 from the Catastrophe
Fund Program. The Township Manager further noted that this
program may change when figures are available toward the end
of the year as to additional revenues which were not anticipated
and which will become available and the appropriation may increase
above that $875,000 figure. The Township Manager further noted
that the program shows a $750,000 appropriation in the year
2012 and 2013 and a $500,000 appropriation in the year 2014
and 2015. The Township Manager noted that projecting it out
at a high cost for the construction of $6,000,000, it appears
that the funds appropriated in the five year period would be
sufficient. Councilwoman Hayden raised an issue with respect
to the new building construction and what would occur should
the Township encounter major sinkholes in the area. After a
discussion, it was determined that the Township Manager ask
the Township Engineer about sinkholes being a problem for the
proposed construction. Overall, the Board found the program
acceptable.
With respect
to the program titled Fire Apparatus Replacement, the Township
Manager advised that the program shows a $125,000 appropriation
for the years 2011 through 2013 and a $200,000 appropriation
for the years 2014 and 2015. There was a discussion with respect
to the current fire apparatus equipment being newer than most
local fire companies and in good shape and the fact that the
Board felt there was not an immediate need for replacement.
The Board found the program acceptable to them.
At this point
in the meeting, there was a discussion regarding the fact that
one of the Township’s air conditioning/heating systems
was not working. The system in question is the system located
in the Township Clerk’s area to include the Building
Inspection Office, file room, bathroom facilities and kitchen
area. The Township Clerk noted that the maintenance contractor
called in had indicated that a new unit may come in at a cost
between $10,000 and $15,000. Councilman Atkinson commented
that he thought that you could still get R22 systems. The new
system proposed is most likely an R410A. Council directed the
Township Clerk to secure a proposal from the contractor and
then further discussion could occur.
At this point
in the meeting, Chairman Paulus closed the Public Hearing relative
to the proposed Five Year Capital Program. It was noted that
no further meetings will be necessary and that the program
can be adopted by Resolution at an upcoming Council meeting.